Parameter Detail: MEIS1-30

start date (GMT) 2008-10-16 (290)
end date (GMT) 2008-10-17 (291)
team ohnishi
disk diameter [mm] 30
target liquid bridge length [mm] 4.3
initial gap [mm] 1.3
cooling disk position at the end of experiment [mm] 0
aspect ratio (L/D)
typical volume ratio (V/V0)
measuring point in IR image coordinate (X1, Y1) (228,120)
operation target Detached Mode
note The liquid bridge was not formed by shortage of liquid. MEIS-1 closed.