Parameter Detail: MEIS1-03

start date (GMT) 2008-08-25 (238)
end date (GMT) 2008-08-26 (239)
team ALL
disk diameter [mm] 30
target liquid bridge length [mm] 9
initial gap [mm] 0.46
cooling disk position at the end of experiment [mm] 0
aspect ratio (L/D) 0.3
typical volume ratio (V/V0)
measuring point in IR image coordinate (X1, Y1) (228,119)
operation target critical DT
note study of air bubble removal