Parameter Detail: MEIS4-22

start date (GMT) 2010-12-14 (348)
end date (GMT) 2010-12-15 (349)
team ueno/sakurai
disk diameter [mm] 50
target liquid bridge length [mm]
initial gap [mm]
cooling disk position at the end of experiment [mm]
aspect ratio (L/D)
typical volume ratio (V/V0)
measuring point in IR image coordinate (X1, Y1) (218,122)
operation target critical DT
note No experiment data. The experiment was aborted by communication line error.