Parameter Detail: MEIS5-08

start date (GMT) 2012-07-13 (195)
end date (GMT) 2012-07-14 (196)
team ueno
disk diameter [mm] 50
target liquid bridge length [mm] 17.5
initial gap [mm] 0.525
cooling disk position at the end of experiment [mm] 0
aspect ratio (L/D) 0.35
typical volume ratio (V/V0) 0.89
measuring point in IR image coordinate (X1, Y1) (153,124)
operation target critical DT, PAS
note 21:40-00:14 air bubble removal. No VRU Recording