VSOG Interface Updates
- 03 April 1998 - Add link to VMOH (pge)
- 07 November 1997 - Add ``Space Radio Telescope (SRT) Schedule File Version 3.4 (DRAFT)'' (ym)
- 10 September 1997 - Add ``VSOP Observation Summary File Format'' (pge)
- 6 January 1997 - Put ``SVLBI Space Radio Telescope Log Input to the Canadian (S2) Correlator Rev. 1.4 January 2, 1997''.(ym)
- 23 December 1996 - Put ``Summary og the meeting @ ISAS in 1996 Dec 13-14''.(ym)
- 20 December 1996 - Put ``ISAS server operation plan document''. (ym)
- 16 December 1996 - Put new versions of many documents on line, with
notes about approval and status, based on results of VSOG meeting at ISAS on
13-14 December 1996 (jsu)
- 12 November 1996 - Put Version 3.0 of [In-Orbit Checkout Plan
for VSOP Radio Telescope] on line to replace Version 2.0. Added new
specification of [Array Operations Center Requirements on VSOP Calibration
Data] (jsu)
- 31 August 1996 - Put new version of [SVLBI Space Radio Telescope Log
Input to the Canadian (S2) Correlator] and add new two documents, [S2 VLBI
"Tape ID" and "User Info Field" Format Requirements for the Canadian (S2)
Correlator - Rev 1.1] and [Specifications for Input Log to the Mitaka
FX-Correlator] (ym)
- 18 July 1996 - Put new version of [DeltaT File for Space VLBI] and
[Flag Table Definition for VSOP Spacecraft Data] (ym)
- 1 July 1996 - Put new version of [Alternative Log Input to the VLBA Correlator for Space VLBI Obsevatory] (ym)
- 23 June 1996 - Put on VSOPWWW server (ym)
- 20 June 1996 - Initial html page (jsu)
Return to VSOG Interface Specifications.