Parameter Detail: DS2-01
start date (GMT) | 2014-11-30 (334) |
---|---|
end date (GMT) | 2014-12-01 (335) |
team | |
disk diameter [mm] | 10 |
target liquid bridge length [mm] | |
initial gap [mm] | |
cooling disk position at the end of experiment [mm] | 3 |
aspect ratio (L/D) | |
typical volume ratio (V/V0) | |
MIDM image position from HD surface (Edge) [mm] | |
recording status | without VRU Rec. |
operation target | functional check |
note | checkout operation (cont.); misaligned IR image fieldcheckout operation; |