Parameter Detail: DS2-17

start date (GMT) 2015-03-06 (65)
end date (GMT) 2015-03-07 (66)
team
disk diameter [mm] 10
target liquid bridge length [mm] 5
initial gap [mm] 6.00
cooling disk position at the end of experiment [mm] 1
aspect ratio (L/D) 0.5
typical volume ratio (V/V0) 0.6
MIDM image position from HD surface (Edge) [mm]
recording status without VRU Rec.
operation target influence of cooling disk temp. on critical DT
note