Parameter Detail: MEIS4-20

start date (GMT) 2010-12-09 (343)
end date (GMT) 2010-12-10 (344)
team nishino
disk diameter [mm] 50
target liquid bridge length [mm] 40.5
initial gap [mm] 0.50
cooling disk position at the end of experiment [mm] 0
aspect ratio (L/D) 0.81
typical volume ratio (V/V0) 0.95
measuring point in IR image coordinate (X1, Y1) (180,122)
operation target critical DT
note No image data from 0:20 to Exp. end, according to malfunction of IPU.