Parameter Detail: MEIS5-14

start date (GMT) 2012-07-25 (207)
end date (GMT) 2012-07-26 (208)
team nishino
disk diameter [mm] 50
target liquid bridge length [mm] 50
initial gap [mm] 0.525
cooling disk position at the end of experiment [mm] 0
aspect ratio (L/D) 1.00
typical volume ratio (V/V0) 0.98
measuring point in IR image coordinate (X1, Y1) (216,124)
operation target observation on high Marangoni number
note e=18. 21:15-01:32 air bubble removal