Parameter Detail: MEIS5-28DAY

start date (GMT) 2013-02-10 (41)
end date (GMT) 2013-02-11 (42)
team nishino
disk diameter [mm] 50
target liquid bridge length [mm] 11.5
initial gap [mm] 1.00
cooling disk position at the end of experiment [mm] 10.5
aspect ratio (L/D) 0.23
typical volume ratio (V/V0) 0.945
measuring point in IR image coordinate (X1, Y1) (204,124)
operation target PAS
note operation in ISS daytime (The experiment in the crew activity time). keeping Liquid Bridge to next Experiment.