Sequence 42013000 Header Page
This page gives a basic description of this sequence
and references to more detailed information.
The following information is also available:
Observation Information
- Object: HERCULES X-1
- Nominal Pointing (degrees)
- R.A.= 254.349
Dec.= 35.262
- Lii= 58.031
Bii= 37.597
- Observation Date: August 26, 1994
- Duration: 86.1 kiloseconds (with 31 kiloseconds of telemetry gaps)
- Approximate SIS Exposure: 26.1 kiloseconds (approximately 2% with telemetry saturated
- Approximate GIS Exposure: 32.5 kiloseconds
Processing Information
- Sequence Version: 006
- Processing Version: 8.0.5 (Revision 2)
- FTOOLS Version: 5.0.d
- Processing Date: August 16, 2000
- GIS Secular Gain Calibration Date May 4, 2000
- GIS Gain Map Calibration Date: October 1, 1999
- SIS CTI Calibration Date: October 3, 1997
US Principal Investigator
DR. RICHARD A. MCCRAY
JOINT INSTITUTE FOR LABORATORY ASTROPHYSICS
UNIVERSITY OF COLORADO, BOULDER
CAMPUS BOX 440
BOULDER, CO 80309
USA
DICK@JILA.COLORADO.EDU
Japanese Principal Investigator
NONE