Parameter Detail: ICE-15(run 4)
start date (GMT) |
2009-01-27 (27) |
end date (GMT) |
2009-01-27 (27) |
degree of supercooling |
0.90 |
crystalization cell temperature [degC] |
2.92 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-8 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
05:02:40 |
control time (nucleation start) |
06:15:22 |
control time (laten heat release) |
06:17:00 |
control time (crystalize start) |
06:24:18 |
control time (melt start) |
06:25:15 |
control time (melt end) |
06:28:00 |
control duration (stabilization) |
01:12:42 |
control duration (nucleation) |
00:01:38 |
control duration (crystalization) |
00:08:56 |
control duration (observation) |
00:00:57 |
control duration (total) |
00:12:38 |