Parameter Detail: ICE-19(run 1)
start date (GMT) |
2009-02-09 (40) |
end date (GMT) |
2009-02-09 (40) |
degree of supercooling |
1.60 |
crystalization cell temperature [degC] |
2.22 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-5.5 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
00:03:05 |
control time (nucleation start) |
01:11:35 |
control time (laten heat release) |
01:12:40 |
control time (crystalize start) |
01:20:30 |
control time (melt start) |
01:20:30 |
control time (melt end) |
01:24:00 |
control duration (stabilization) |
01:08:30 |
control duration (nucleation) |
00:01:05 |
control duration (crystalization) |
00:08:55 |
control duration (observation) |
00:00:00 |
control duration (total) |
00:12:25 |
note |
|