Parameter Detail: ICE-19(run 1)

start date (GMT) 2009-02-09 (40)
end date (GMT) 2009-02-09 (40)
degree of supercooling 1.60
crystalization cell temperature [degC] 2.22
nucleation cell temperature (pre nucleation) [degC] 10
nucleation cell temperature (nucleation start) [degC] -10
nucleation cell temperature (laten heat release) [degC] -5.5
nucleation cell temperature (post nucleation) [degC] 0
control time (stabilization start) 00:03:05
control time (nucleation start) 01:11:35
control time (laten heat release) 01:12:40
control time (crystalize start) 01:20:30
control time (melt start) 01:20:30
control time (melt end) 01:24:00
control duration (stabilization) 01:08:30
control duration (nucleation) 00:01:05
control duration (crystalization) 00:08:55
control duration (observation) 00:00:00
control duration (total) 00:12:25
note