Parameter Detail: ICE-20(run 1)
start date (GMT) |
2009-02-09 (40) |
end date (GMT) |
2009-02-09 (40) |
degree of supercooling |
1.80 |
crystalization cell temperature [degC] |
2.02 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-4.1 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
01:35:39 |
control time (nucleation start) |
02:35:46 |
control time (laten heat release) |
02:37:00 |
control time (crystalize start) |
02:44:00 |
control time (melt start) |
02:44:00 |
control time (melt end) |
02:48:00 |
control duration (stabilization) |
01:00:07 |
control duration (nucleation) |
00:01:14 |
control duration (crystalization) |
00:08:14 |
control duration (observation) |
00:00:00 |
control duration (total) |
00:12:14 |
note |
|