Parameter Detail: ICE-22(run 5)
start date (GMT) |
2009-01-14 (14) |
end date (GMT) |
2009-01-14 (14) |
degree of supercooling |
0.04 |
crystalization cell temperature [degC] |
3.78 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-13 |
nucleation cell temperature (post nucleation) [degC] |
3.78 |
control time (stabilization start) |
19:48:43 |
control time (nucleation start) |
21:15:44 |
control time (laten heat release) |
21:22:45 |
control time (crystalize start) |
21:40:08 |
control time (melt start) |
22:47:20 |
control time (melt end) |
22:49:45 |
control duration (stabilization) |
01:27:01 |
control duration (nucleation) |
00:07:01 |
control duration (crystalization) |
00:24:24 |
control duration (observation) |
01:07:12 |
control duration (total) |
01:34:01 |
note |
|