Parameter Detail: ICE-06(run 4)

start date (GMT) 2009-01-30 (30)
end date (GMT) 2009-01-30 (30)
degree of supercooling 0.09
crystalization cell temperature [degC] 3.73
nucleation cell temperature (pre nucleation) [degC] 10
nucleation cell temperature (nucleation start) [degC] -10
nucleation cell temperature (laten heat release) [degC] -4
nucleation cell temperature (post nucleation) [degC] 3.73
control time (stabilization start) 00:33:08
control time (nucleation start) 02:48:58
control time (laten heat release) 02:50:10
control time (crystalize start) 03:01:28
control time (melt start) 03:25:00
control time (melt end) 03:24:00
control duration (stabilization) 02:15:50
control duration (nucleation) 00:01:12
control duration (crystalization) 00:12:30
control duration (observation) 00:23:32
control duration (total) 00:35:02
note