Parameter Detail: ICE-06(run 4)
start date (GMT) |
2009-01-30 (30) |
end date (GMT) |
2009-01-30 (30) |
degree of supercooling |
0.09 |
crystalization cell temperature [degC] |
3.73 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-4 |
nucleation cell temperature (post nucleation) [degC] |
3.73 |
control time (stabilization start) |
00:33:08 |
control time (nucleation start) |
02:48:58 |
control time (laten heat release) |
02:50:10 |
control time (crystalize start) |
03:01:28 |
control time (melt start) |
03:25:00 |
control time (melt end) |
03:24:00 |
control duration (stabilization) |
02:15:50 |
control duration (nucleation) |
00:01:12 |
control duration (crystalization) |
00:12:30 |
control duration (observation) |
00:23:32 |
control duration (total) |
00:35:02 |
note |
|