Parameter Detail: ICE-07(run 2)
start date (GMT) |
2009-01-13 (13) |
end date (GMT) |
2009-01-13 (13) |
degree of supercooling |
0.10 |
crystalization cell temperature [degC] |
3.72 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-8.8 |
nucleation cell temperature (post nucleation) [degC] |
0 -> 3.72 |
control time (stabilization start) |
01:22:40 |
control time (nucleation start) |
02:08:33 |
control time (laten heat release) |
02:10:20 |
control time (crystalize start) |
02:39:00 |
control time (melt start) |
03:03:00 |
control time (melt end) |
03:05:00 |
control duration (stabilization) |
00:45:53 |
control duration (nucleation) |
00:01:47 |
control duration (crystalization) |
00:30:27 |
control duration (observation) |
00:24:00 |
control duration (total) |
00:56:27 |