Parameter Detail: ICE-08(run 1)
start date (GMT) |
2008-12-02 (337) |
end date (GMT) |
2008-12-03 (338) |
degree of supercooling |
0.20 |
crystalization cell temperature [degC] |
3.62 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-5.4 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
23:18:00 |
control time (nucleation start) |
00:50:00 |
control time (laten heat release) |
00:51:00 |
control time (crystalize start) |
01:06:00 |
control time (melt start) |
01:13:00 |
control time (melt end) |
01:17:00 |
control duration (stabilization) |
01:32:00 |
control duration (nucleation) |
00:01:00 |
control duration (crystalization) |
00:16:00 |
control duration (observation) |
00:07:00 |
control duration (total) |
00:27:00 |
note |
|