Parameter Detail: ICE-08(run 2)
start date (GMT) |
2009-01-13 (13) |
end date (GMT) |
2009-01-13 (13) |
degree of supercooling |
0.20 |
crystalization cell temperature [degC] |
3.62 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-7.8 |
nucleation cell temperature (post nucleation) [degC] |
3.62 |
control time (stabilization start) |
03:10:09 |
control time (nucleation start) |
04:18:01 |
control time (laten heat release) |
04:19:40 |
control time (crystalize start) |
04:24:25 |
control time (melt start) |
04:31:37 |
control time (melt end) |
04:34:00 |
control duration (stabilization) |
01:07:52 |
control duration (nucleation) |
00:01:39 |
control duration (crystalization) |
00:06:24 |
control duration (observation) |
00:07:12 |
control duration (total) |
00:15:59 |
note |
|