Parameter Detail: ICE-09(run 1)
start date (GMT) |
2008-12-02 (337) |
end date (GMT) |
2008-12-02 (337) |
degree of supercooling |
0.30 |
crystalization cell temperature [degC] |
3.52 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-6.4 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
21:35:00 |
control time (nucleation start) |
22:27:00 |
control time (laten heat release) |
22:28:00 |
control time (crystalize start) |
22:39:00 |
control time (melt start) |
22:44:00 |
control time (melt end) |
22:47:00 |
control duration (stabilization) |
00:52:00 |
control duration (nucleation) |
00:01:00 |
control duration (crystalization) |
00:12:00 |
control duration (observation) |
00:05:00 |
control duration (total) |
00:20:00 |
note |
|