Parameter Detail: ICE-09(run 1)

start date (GMT) 2008-12-02 (337)
end date (GMT) 2008-12-02 (337)
degree of supercooling 0.30
crystalization cell temperature [degC] 3.52
nucleation cell temperature (pre nucleation) [degC] 10
nucleation cell temperature (nucleation start) [degC] -10
nucleation cell temperature (laten heat release) [degC] -6.4
nucleation cell temperature (post nucleation) [degC] 0
control time (stabilization start) 21:35:00
control time (nucleation start) 22:27:00
control time (laten heat release) 22:28:00
control time (crystalize start) 22:39:00
control time (melt start) 22:44:00
control time (melt end) 22:47:00
control duration (stabilization) 00:52:00
control duration (nucleation) 00:01:00
control duration (crystalization) 00:12:00
control duration (observation) 00:05:00
control duration (total) 00:20:00
note