Parameter Detail: ICE-09(run 2)

start date (GMT) 2008-12-08 (343)
end date (GMT) 2008-12-09 (344)
degree of supercooling 0.30
crystalization cell temperature [degC] 3.52
nucleation cell temperature (pre nucleation) [degC] 10
nucleation cell temperature (nucleation start) [degC] -10
nucleation cell temperature (laten heat release) [degC] -6.4
nucleation cell temperature (post nucleation) [degC] 0
control time (stabilization start) 22:17:00
control time (nucleation start) 01:00:00
control time (laten heat release) 01:01:25
control time (crystalize start) 01:12:00
control time (melt start) 01:17:51
control time (melt end) 01:21:00
control duration (stabilization) 02:43:00
control duration (nucleation) 00:01:25
control duration (crystalization) 00:12:00
control duration (observation) 00:05:51
control duration (total) 00:21:00
note