Parameter Detail: ICE-09(run 9)
start date (GMT) |
2009-02-15 (46) |
end date (GMT) |
2009-02-16 (47) |
degree of supercooling |
0.30 |
crystalization cell temperature [degC] |
3.52 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-1.5 |
nucleation cell temperature (post nucleation) [degC] |
0 -> -10 |
control time (stabilization start) |
23:36:54 |
control time (nucleation start) |
01:04:07 |
control time (laten heat release) |
01:04:50 |
control time (crystalize start) |
01:30:00 |
control time (melt start) |
01:30:00 |
control time (melt end) |
01:30:00 |
control duration (stabilization) |
01:27:13 |
control duration (nucleation) |
00:00:43 |
control duration (crystalization) |
00:25:53 |
control duration (observation) |
00:00:00 |
control duration (total) |
00:25:53 |