Parameter Detail: ICE-09(run 9)

start date (GMT) 2009-02-15 (46)
end date (GMT) 2009-02-16 (47)
degree of supercooling 0.30
crystalization cell temperature [degC] 3.52
nucleation cell temperature (pre nucleation) [degC] 10
nucleation cell temperature (nucleation start) [degC] -10
nucleation cell temperature (laten heat release) [degC] -1.5
nucleation cell temperature (post nucleation) [degC] 0 -> -10
control time (stabilization start) 23:36:54
control time (nucleation start) 01:04:07
control time (laten heat release) 01:04:50
control time (crystalize start) 01:30:00
control time (melt start) 01:30:00
control time (melt end) 01:30:00
control duration (stabilization) 01:27:13
control duration (nucleation) 00:00:43
control duration (crystalization) 00:25:53
control duration (observation) 00:00:00
control duration (total) 00:25:53
note