Parameter Detail: ICE-10(run 5)
start date (GMT) |
2009-01-31 (31) |
end date (GMT) |
2009-01-31 (31) |
degree of supercooling |
0.40 |
crystalization cell temperature [degC] |
3.42 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-4.5 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
01:01:46 |
control time (nucleation start) |
03:15:50 |
control time (laten heat release) |
03:16:56 |
control time (crystalize start) |
03:45:00 |
control time (melt start) |
03:50:00 |
control time (melt end) |
03:55:00 |
control duration (stabilization) |
02:14:04 |
control duration (nucleation) |
00:01:06 |
control duration (crystalization) |
00:29:10 |
control duration (observation) |
00:05:00 |
control duration (total) |
00:39:10 |
note |
|