Parameter Detail: ICE-11(run 4)

start date (GMT) 2009-01-22 (22)
end date (GMT) 2009-01-22 (22)
degree of supercooling 0.50
crystalization cell temperature [degC] 3.32
nucleation cell temperature (pre nucleation) [degC] 10
nucleation cell temperature (nucleation start) [degC] -10
nucleation cell temperature (laten heat release) [degC] -3.9
nucleation cell temperature (post nucleation) [degC] 0
control time (stabilization start) 19:49:15
control time (nucleation start) 21:15:32
control time (laten heat release) 21:16:25
control time (crystalize start) 21:27:10
control time (melt start) 21:30:52
control time (melt end) 21:33:57
control duration (stabilization) 01:26:17
control duration (nucleation) 00:00:53
control duration (crystalization) 00:11:38
control duration (observation) 00:03:42
control duration (total) 00:18:25
note