Parameter Detail: ICE-13(run 4)
start date (GMT) |
2009-01-27 (27) |
end date (GMT) |
2009-01-27 (27) |
degree of supercooling |
0.70 |
crystalization cell temperature [degC] |
3.12 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-3 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
01:21:18 |
control time (nucleation start) |
03:00:32 |
control time (laten heat release) |
03:01:13 |
control time (crystalize start) |
03:18:10 |
control time (melt start) |
03:20:00 |
control time (melt end) |
03:23:12 |
control duration (stabilization) |
01:39:14 |
control duration (nucleation) |
00:00:41 |
control duration (crystalization) |
00:17:38 |
control duration (observation) |
00:01:50 |
control duration (total) |
00:22:40 |
note |
|