Parameter Detail: DS2-24

start date (GMT) 2015-03-21 (80)
end date (GMT) 2015-03-22 (81)
team
disk diameter [mm] 10
target liquid bridge length [mm] 5
initial gap [mm] 2.50
cooling disk position at the end of experiment [mm] 4.5
aspect ratio (L/D) 0.5
typical volume ratio (V/V0) 0.7, 0.8
MIDM image position from HD surface (Edge) [mm]
recording status without VRU Rec.
operation target influence of cooling disk temp. on critical DT
note 23:35-00:07 air bubble removal