Parameter Detail: ICE-01(run 14)

start date (GMT) 2009-01-06 (6)
end date (GMT) 2009-01-07 (7)
degree of supercooling 0.03
crystalization cell temperature [degC] 3.79
nucleation cell temperature (pre nucleation) [degC] 10
nucleation cell temperature (nucleation start) [degC] -10
nucleation cell temperature (laten heat release) [degC] -6.6
nucleation cell temperature (post nucleation) [degC] 3.79 -> 3.77
control time (stabilization start) 22:55:00
control time (nucleation start) 01:30:12
control time (laten heat release) 01:31:30
control time (crystalize start) 01:53:45
control time (melt start) 02:58:15
control time (melt end) 03:01:00
control duration (stabilization) 02:35:12
control duration (nucleation) 00:01:18
control duration (crystalization) 00:23:33
control duration (observation) 01:04:30
control duration (total) 01:30:48
note