Parameter Detail: ICE-01(run 16)
start date (GMT) |
2009-01-19 (19) |
end date (GMT) |
2009-01-20 (20) |
degree of supercooling |
0.03 |
crystalization cell temperature [degC] |
3.79 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-7.9 |
nucleation cell temperature (post nucleation) [degC] |
3.79 |
control time (stabilization start) |
22:00:10 |
control time (nucleation start) |
23:00:33 |
control time (laten heat release) |
23:02:00 |
control time (crystalize start) |
23:38:10 |
control time (melt start) |
01:00:10 |
control time (melt end) |
01:02:24 |
control duration (stabilization) |
01:00:23 |
control duration (nucleation) |
00:01:27 |
control duration (crystalization) |
00:37:37 |
control duration (observation) |
01:22:00 |
control duration (total) |
02:01:51 |
note |
|