Parameter Detail: ICE-01(run 17)

start date (GMT) 2009-01-20 (20)
end date (GMT) 2009-01-20 (20)
degree of supercooling 0.03
crystalization cell temperature [degC] 3.79
nucleation cell temperature (pre nucleation) [degC] 10
nucleation cell temperature (nucleation start) [degC] -10
nucleation cell temperature (laten heat release) [degC] -8
nucleation cell temperature (post nucleation) [degC] 3.79
control time (stabilization start) 03:25:10
control time (nucleation start) 04:30:18
control time (laten heat release) 04:32:08
control time (crystalize start) 05:02:57
control time (melt start) 07:06:50
control time (melt end) 07:08:40
control duration (stabilization) 01:05:08
control duration (nucleation) 00:01:50
control duration (crystalization) 00:32:39
control duration (observation) 02:03:53
control duration (total) 02:38:22
note