Parameter Detail: ICE-01(run 22)

start date (GMT) 2009-02-09 (40)
end date (GMT) 2009-02-09 (40)
degree of supercooling 0.03
crystalization cell temperature [degC] 3.79
nucleation cell temperature (pre nucleation) [degC] 10
nucleation cell temperature (nucleation start) [degC] -10
nucleation cell temperature (laten heat release) [degC] -2
nucleation cell temperature (post nucleation) [degC] 3.79
control time (stabilization start) 19:39:46
control time (nucleation start) 21:03:16
control time (laten heat release) 21:04:00
control time (crystalize start) 21:27:30
control time (melt start) 22:43:18
control time (melt end) 22:45:35
control duration (stabilization) 01:23:30
control duration (nucleation) 00:00:44
control duration (crystalization) 00:24:14
control duration (observation) 01:15:48
control duration (total) 01:42:19
note