Parameter Detail: ICE-02(run 2)
start date (GMT) |
2009-01-07 (7) |
end date (GMT) |
2009-01-07 (7) |
degree of supercooling |
0.05 |
crystalization cell temperature [degC] |
3.77 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-7.5 |
nucleation cell temperature (post nucleation) [degC] |
3.77 |
control time (stabilization start) |
19:53:00 |
control time (nucleation start) |
20:50:08 |
control time (laten heat release) |
20:51:30 |
control time (crystalize start) |
21:06:25 |
control time (melt start) |
21:46:45 |
control time (melt end) |
21:49:18 |
control duration (stabilization) |
00:57:08 |
control duration (nucleation) |
00:01:22 |
control duration (crystalization) |
00:16:17 |
control duration (observation) |
00:40:20 |
control duration (total) |
00:59:10 |
note |
|