Parameter Detail: ICE-02(run 3)
start date (GMT) |
2009-01-07 (7) |
end date (GMT) |
2009-01-08 (8) |
degree of supercooling |
0.05 |
crystalization cell temperature [degC] |
3.77 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-6.2 |
nucleation cell temperature (post nucleation) [degC] |
3.77 |
control time (stabilization start) |
22:25:10 |
control time (nucleation start) |
00:09:08 |
control time (laten heat release) |
00:10:20 |
control time (crystalize start) |
00:28:47 |
control time (melt start) |
01:33:26 |
control time (melt end) |
01:35:50 |
control duration (stabilization) |
01:43:58 |
control duration (nucleation) |
00:01:12 |
control duration (crystalization) |
00:19:39 |
control duration (observation) |
01:04:39 |
control duration (total) |
01:26:42 |
note |
|