Parameter Detail: ICE-02(run 3)

start date (GMT) 2009-01-07 (7)
end date (GMT) 2009-01-08 (8)
degree of supercooling 0.05
crystalization cell temperature [degC] 3.77
nucleation cell temperature (pre nucleation) [degC] 10
nucleation cell temperature (nucleation start) [degC] -10
nucleation cell temperature (laten heat release) [degC] -6.2
nucleation cell temperature (post nucleation) [degC] 3.77
control time (stabilization start) 22:25:10
control time (nucleation start) 00:09:08
control time (laten heat release) 00:10:20
control time (crystalize start) 00:28:47
control time (melt start) 01:33:26
control time (melt end) 01:35:50
control duration (stabilization) 01:43:58
control duration (nucleation) 00:01:12
control duration (crystalization) 00:19:39
control duration (observation) 01:04:39
control duration (total) 01:26:42
note