Parameter Detail: ICE-03(run 1)
start date (GMT) |
2008-12-10 (345) |
end date (GMT) |
2008-12-10 (345) |
degree of supercooling |
0.06 |
crystalization cell temperature [degC] |
3.76 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-9.1 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
20:41:13 |
control time (nucleation start) |
22:18:10 |
control time (laten heat release) |
22:19:50 |
control time (crystalize start) |
22:49:15 |
control time (melt start) |
23:07:00 |
control time (melt end) |
23:09:30 |
control duration (stabilization) |
01:36:57 |
control duration (nucleation) |
00:01:40 |
control duration (crystalization) |
00:31:05 |
control duration (observation) |
00:17:45 |
control duration (total) |
00:51:20 |
note |
|