Parameter Detail: ICE-03(run 2)
start date (GMT) |
2009-01-08 (8) |
end date (GMT) |
2009-01-09 (9) |
degree of supercooling |
0.06 |
crystalization cell temperature [degC] |
3.76 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-6.6 |
nucleation cell temperature (post nucleation) [degC] |
3.76 |
control time (stabilization start) |
23:45:10 |
control time (nucleation start) |
01:04:48 |
control time (laten heat release) |
01:06:15 |
control time (crystalize start) |
01:21:40 |
control time (melt start) |
02:01:51 |
control time (melt end) |
02:04:27 |
control duration (stabilization) |
01:19:38 |
control duration (nucleation) |
00:01:27 |
control duration (crystalization) |
00:16:52 |
control duration (observation) |
00:40:11 |
control duration (total) |
00:59:39 |
note |
|