Parameter Detail: ICE-03(run 4)
start date (GMT) |
2009-01-14 (14) |
end date (GMT) |
2009-01-15 (15) |
degree of supercooling |
0.06 |
crystalization cell temperature [degC] |
3.76 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-6.8 |
nucleation cell temperature (post nucleation) [degC] |
3.76 |
control time (stabilization start) |
23:05:10 |
control time (nucleation start) |
23:59:25 |
control time (laten heat release) |
00:00:45 |
control time (crystalize start) |
00:14:45 |
control time (melt start) |
00:47:20 |
control time (melt end) |
00:49:55 |
control duration (stabilization) |
00:54:15 |
control duration (nucleation) |
00:01:20 |
control duration (crystalization) |
00:15:20 |
control duration (observation) |
00:32:35 |
control duration (total) |
00:50:30 |
note |
|