Parameter Detail: ICE-11(run 5)
start date (GMT) |
2009-01-26 (26) |
end date (GMT) |
2009-01-27 (27) |
degree of supercooling |
0.50 |
crystalization cell temperature [degC] |
3.32 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-5.5 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
23:26:47 |
control time (nucleation start) |
00:43:19 |
control time (laten heat release) |
00:44:25 |
control time (crystalize start) |
00:54:20 |
control time (melt start) |
00:59:00 |
control time (melt end) |
01:02:12 |
control duration (stabilization) |
01:16:32 |
control duration (nucleation) |
00:01:06 |
control duration (crystalization) |
00:11:01 |
control duration (observation) |
00:04:40 |
control duration (total) |
00:18:53 |
note |
|