Parameter Detail: ICE-01(run 9)
start date (GMT) |
2008-12-25 (360) |
end date (GMT) |
2008-12-25 (360) |
degree of supercooling |
0.03 |
crystalization cell temperature [degC] |
3.79 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-10 |
nucleation cell temperature (post nucleation) [degC] |
3.79 -> 3.73 |
control time (stabilization start) |
20:06:05 |
control time (nucleation start) |
21:13:33 |
control time (laten heat release) |
21:16:50 |
control time (crystalize start) |
21:36:30 |
control time (melt start) |
22:04:03 |
control time (melt end) |
22:06:50 |
control duration (stabilization) |
01:07:28 |
control duration (nucleation) |
00:03:17 |
control duration (crystalization) |
00:22:57 |
control duration (observation) |
00:27:33 |
control duration (total) |
00:53:17 |
note |
|