Parameter Detail: DS1-11

start date (GMT) 2013-10-24 (297)
end date (GMT) 2013-10-25 (298)
team
disk diameter [mm] 30
target liquid bridge length [mm] 30
initial gap [mm] 3.00
cooling disk position at the end of experiment [mm] 0
aspect ratio (L/D) 1
typical volume ratio (V/V0) 1
MIDM image position from HD surface (Edge) [mm] 2.0
recording status with VRU Rec.
operation target measuremnet of DSD, flow transition, oscillation mode
note No movie from GMT04:25 to 05:34 and the telemetry data after 4:25 is lacked intermittently.