Parameter Detail: DS1-12

start date (GMT) 2013-12-26 (360)
end date (GMT) 2013-12-27 (361)
team
disk diameter [mm] 30
target liquid bridge length [mm] 15
initial gap [mm] 3.00
cooling disk position at the end of experiment [mm] 0
aspect ratio (L/D) 0.5
typical volume ratio (V/V0) 1
MIDM image position from HD surface (Edge) [mm] 2.0
recording status with VRU Rec.
operation target critical DT
note Experiment was canceled due to FPEF error at GMT00:04. After GMT02:24, the initial gap is 14.99mm in this run.