Parameter Detail: DS1-17
start date (GMT) | 2014-01-13 (13) |
---|---|
end date (GMT) | 2014-01-14 (14) |
team | |
disk diameter [mm] | 30 |
target liquid bridge length [mm] | 15 |
initial gap [mm] | 3.00 |
cooling disk position at the end of experiment [mm] | 0 |
aspect ratio (L/D) | 0.5 |
typical volume ratio (V/V0) | 0.6 |
MIDM image position from HD surface (Edge) [mm] | 2.0 |
recording status | with VRU Rec. |
operation target | critical DT |
note | FPEF restarted from GMT23:57 to 00:15. |