Parameter Detail: DS1-24

start date (GMT) 2014-02-03 (34)
end date (GMT) 2014-02-04 (35)
team
disk diameter [mm] 30
target liquid bridge length [mm] 30
initial gap [mm] 3.00
cooling disk position at the end of experiment [mm] 0
aspect ratio (L/D) 1
typical volume ratio (V/V0) 1
MIDM image position from HD surface (Edge) [mm]
recording status without VRU Rec.
operation target critical DT
note