Parameter Detail: DS1-26

start date (GMT) 2014-02-16 (47)
end date (GMT) 2014-02-17 (48)
team
disk diameter [mm] 30
target liquid bridge length [mm] 60
initial gap [mm] 3.00
cooling disk position at the end of experiment [mm] 0
aspect ratio (L/D) 2
typical volume ratio (V/V0) 0.97
MIDM image position from HD surface (Edge) [mm] 2.0
recording status with VRU Rec.
operation target observation of flow
note