Parameter Detail: DS2-12

start date (GMT) 2015-02-24 (55)
end date (GMT) 2015-02-25 (56)
team
disk diameter [mm] 10
target liquid bridge length [mm] 5
initial gap [mm] 0.15
cooling disk position at the end of experiment [mm] 4.85
aspect ratio (L/D) 0.5
typical volume ratio (V/V0) 1
MIDM image position from HD surface (Edge) [mm]
recording status with VRU Rec. No Down link video.
operation target influence of cooling disk temp. on critical DT
note gas replacement from Neon to Argon