Parameter Detail: DS2-16

start date (GMT) 2015-03-05 (64)
end date (GMT) 2015-03-06 (65)
team
disk diameter [mm] 10
target liquid bridge length [mm] 5
initial gap [mm] 2.50
cooling disk position at the end of experiment [mm] 3.5
aspect ratio (L/D) 0.5
typical volume ratio (V/V0) 0.6
MIDM image position from HD surface (Edge) [mm]
recording status without VRU Rec.
operation target Drying operation for Cooling Disk, and air bubbel removal operation
note 02:43-04:11 air bubble removal