Parameter Detail: DS2-31

start date (GMT) 2015-04-14 (104)
end date (GMT) 2015-04-15 (105)
team
disk diameter [mm] 10
target liquid bridge length [mm] 5
initial gap [mm] 2.50
cooling disk position at the end of experiment [mm] 0
aspect ratio (L/D) 0.5
typical volume ratio (V/V0) 1
MIDM image position from HD surface (Edge) [mm]
recording status without VRU Rec.
operation target Critical DT, Long liquid bridge, Spherical Liquid
note Long liquid bridge (L=31.5mm), Spherical liquid (Dia.=25mm), Fatter liquid bridge (L=40.66mm), etc.