Parameter Detail: DS2-05

start date (GMT) 2015-01-06 (6)
end date (GMT) 2015-01-07 (7)
team
disk diameter [mm] 10
target liquid bridge length [mm] 20
initial gap [mm] 5.00
cooling disk position at the end of experiment [mm] 0
aspect ratio (L/D) 2
typical volume ratio (V/V0) 1
MIDM image position from HD surface (Edge) [mm]
recording status with VRU Rec. No Down link video.
operation target influence of cooling disk temp. on critical DT
note