start date (GMT) |
2015-01-21 (21) |
end date (GMT) |
2015-01-22 (22) |
team |
|
disk diameter [mm] |
10 |
target liquid bridge length [mm] |
5, 2.5 |
initial gap [mm] |
5.00 |
cooling disk position at the end of experiment [mm] |
0, 2.5 |
aspect ratio (L/D) |
0.5, 0.25 |
typical volume ratio (V/V0) |
1 |
MIDM image position from HD surface (Edge) [mm] |
0.23 -> 0.12 |
recording status |
with VRU Rec. No Down link video. |
operation target |
critical DT -> influence of cooling disk temp. on critical DT |
note |
I/O Box OFF at 03:40. After 3:40, Experiment has been canceled. |