Parameter Detail: DS2-08

start date (GMT) 2015-01-21 (21)
end date (GMT) 2015-01-22 (22)
team
disk diameter [mm] 10
target liquid bridge length [mm] 5, 2.5
initial gap [mm] 5.00
cooling disk position at the end of experiment [mm] 0, 2.5
aspect ratio (L/D) 0.5, 0.25
typical volume ratio (V/V0) 1
MIDM image position from HD surface (Edge) [mm] 0.23 -> 0.12
recording status with VRU Rec. No Down link video.
operation target critical DT -> influence of cooling disk temp. on critical DT
note I/O Box OFF at 03:40. After 3:40, Experiment has been canceled.