Parameter Detail: ICE-13(run 6)
| start date (GMT) | 2009-02-09 (40) |
|---|---|
| end date (GMT) | 2009-02-10 (41) |
| degree of supercooling | 0.70 |
| crystalization cell temperature [degC] | 3.12 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -8 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 22:56:54 |
| control time (nucleation start) | 00:05:02 |
| control time (laten heat release) | 00:06:45 |
| control time (crystalize start) | 00:14:35 |
| control time (melt start) | 00:17:50 |
| control time (melt end) | 00:21:02 |
| control duration (stabilization) | 01:08:08 |
| control duration (nucleation) | 00:01:43 |
| control duration (crystalization) | 00:09:33 |
| control duration (observation) | 00:03:15 |
| control duration (total) | 00:16:00 |
| note |