Parameter Detail: ICE-13(run 7)
| start date (GMT) | 2009-02-10 (41) |
|---|---|
| end date (GMT) | 2009-02-11 (42) |
| degree of supercooling | 0.70 |
| crystalization cell temperature [degC] | 3.12 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -0.5 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 22:50:00 |
| control time (nucleation start) | 00:32:10 |
| control time (laten heat release) | 00:32:51 |
| control time (crystalize start) | 00:44:30 |
| control time (melt start) | 00:47:30 |
| control time (melt end) | 00:50:30 |
| control duration (stabilization) | 01:42:10 |
| control duration (nucleation) | 00:00:41 |
| control duration (crystalization) | 00:12:20 |
| control duration (observation) | 00:03:00 |
| control duration (total) | 00:18:20 |
| note |