Parameter Detail: ICE-14(run 3)
| start date (GMT) | 2009-01-23 (23) |
|---|---|
| end date (GMT) | 2009-01-23 (23) |
| degree of supercooling | 0.80 |
| crystalization cell temperature [degC] | 3.02 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -6 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 06:18:54 |
| control time (nucleation start) | 07:35:39 |
| control time (laten heat release) | 07:36:56 |
| control time (crystalize start) | 07:45:30 |
| control time (melt start) | 07:47:15 |
| control time (melt end) | 07:49:00 |
| control duration (stabilization) | 01:16:45 |
| control duration (nucleation) | 00:01:17 |
| control duration (crystalization) | 00:09:51 |
| control duration (observation) | 00:01:45 |
| control duration (total) | 00:13:21 |
| note |